Asbestos - On site demo inspection (L&I)
Asbestos Abatement Design
Asbestos Abatement Design 2
Asbestos Abatement Design 3
Asbestos attic inspection after removal
Asbestos attic inspection
Asbestos caulk identified during inspection
Asbestos containing firedoor identified during inspection
Asbestos containment pre inspection (2)
Asbestos containment pre inspection
Asbestos crawlspace inspection following removal
Asbestos debris in vacant vandalized bldg
Asbestos expansion jacket identified during inspection
Asbestos fibers as seen by an electron microscope
Asbestos fireproofing overspray
Asbestos floor tile evaluation
Asbestos inspection - Blight Program (L&I)
Asbestos outdoor containment barrier
Asbestos outdoor insulation removal
Asbestos outdoor pipe insulation removal
Asbestos pipe insulation in older buildings
Asbestos pipe tunnel inspection
Asbestos piping in Library
Asbestos sampling of roof membrane
Asbestos survey in Boiler Rm
IAQ DELMHORST Moisture Meter2
IAQ EXTECH humidity temp air flow
IAQ Gas Badge Sulfer Diox Monitor2
IAQ PROTIMITER Moisture Meter2
IAQ TIF 8800 Methane Detector2
IAQ TRAMEX Moisture Meter2
Jack Frost Delaware Avenue (Sugarhouse)
Jack Frost Sugarhouse Project
Lead Based Paint (LBP) Flyer
Lead in water cooler evaluation
Lead Test in action with XRF
Mold assessment after water intrusion
Mold growth assessment on ceiling tile
Mold inspecting above drop ceiling
Raymond Rosen (PHA) before implosion
Raymond Rosen during implosion monitoring
Veteran Stadium during Implosion